WYE is fully capable of handling large-scale, advanced V2X infrastructure projects and managing complex government procedures. Our hands-on experience includes delivering complete V2X setups from site surveys, technical consultations, and RSE structural reports to the physical installation of IP54+ ground control panels housing Edge PCs, uninterruptible power supply (UPS) batteries, and PoE switches.


The work inculdes the following.

Engineering & RSE Approval: Conducted site surveys, technical consultations, and Registered Structural Engineer (RSE) calculations. Designing structural plans that could pass strict government safety checks and rigorous RSE approvals before work started.


Weatherproof Control Panel Assembly and install: Installed a custom ground-level steel panel IP54+, housing the Edge PC, UPS battery, PoE switch, and power system. Safely wiring and fitting multiple sensitive electronics into a compact enclosure built to survive harsh outdoor weather.


High-Level Device Installation & Cabling: Mounted LiDAR, LTE-V, GNSS, and 4G/5G Wi-Fi antennas onto street lampposts at a height of 5 meters, running cables down to the ground panel. Involved working safely at heights on active roads and routing cables tightly within strict lamppost space limits.


Government Paperwork & Bureaucracy: Handled all applications for Temporary Traffic Arrangements (TTA) and excavation/works permits. Navigating heavy paperwork and coordinating across multiple departments (Highways, Transport, and Police) to secure approvals without project delays.