top of page

BCI ENGINEERING LTD

  • Writer: WYE
    WYE
  • Apr 1, 2018
  • 1 min read

Updated: Nov 8, 2024

Title: Installation of new power distribution system and optimize the man & machine control system for the “Beer” production line.


Content: Installation of new power distribution networks in a new factory building to supply electivity power to the production machine, assisting the client to apply WR1 for the whole power distribution network that is the main task on this project. WYE also involves on the control system design, providing professional technical service to assist the client on optimization of man & machine operation, installation of new HLT & CLT pressure switch and sensing equipment to monitor the status of live operation in order to increasing the efficiency and reduce the loss of production.

The design of the control system was a unique approach because of the space restriction of the building advise

 
 
 

Comments


© 2024 by WORLD YOUTH ENGINEERING CONSULTANTS LTD

MITSUBISHI ELECTRIC.png
emsd.png
CIC_logo_horizontal_bilingual_cmyk_300dpi.jpg
bottom of page