Title: Site Survey for Conveyor control panel

 

The works includes the following.

1.   On-site technical study for the conveyor control panel.

2.   On-site technical study for the field conveyor equipment and device.

3.   Download the existing PLC programme and study the PLC programme logic.

4.    Re-draw a set of panel control drawing in CAD format.

5.    Remove the existing unused equipment, device and component (if possible), refix the current cable wire with cable marking.

6.    Provision of Panel and Field equipment maintenance PMI".